{"schema":"sanctity-signal/0.2","record_type":"signal","id":"giga-energy-clay-1bn-lease-e099","domain":"compute","drop_id":"signal-e099","occurred_at":"2026-11-17","how_to_use":"This is a structured record of one real-world action and its competing interpretations, from Sanctity Signal. To build content from it (a reel script, a blog, a thread): open on the hook, ground the viewer with plain and observed, walk the dated trail, present the interpretations as live tension between named readings, and close on the before/after shift and what_to_watch. Hard rules: items under established are fact; items under unknown are never presented as fact; the evidence status (verified or reported) is stated, not dropped; sources are cited.","actor":"Giga Energy","action_type":"10-year lease worth about $1 billion on Project Clay, a 60 megawatt data centre in Hunt County, Texas, with the tenant named only as a United States AI cloud provider","observed":"Giga Energy issued 2 releases through GlobeNewswire on November 17, 2026. The first, dateline Houston at 09:00 Eastern Time, is headed \"Giga Energy Inks 10-Year, $1B Lease on Project Marl, a 60MW AI Data Center in Hunt County, TX\". The second, dateline Royse City at 11:35 Eastern Time, is identical in shape and headed \"Project Clay\". Only Project Clay appears on Giga's own newsroom at gigaenergy.com, where it is the most recent item, above a September 30 post. Reuters carried Clay alone, at 06:07 Pacific Time. Terms, common to both releases: a 10-year lease worth about $1 billion; a 60 megawatt GigaBase campus of about 30 acres in Hunt County, Texas; groundbreaking in July; build time under 8 months, described as less than half a traditional build; in service spring 2027; about 300 construction jobs and 24 permanent positions at an estimated $116,000 to $180,000; \"millions\" of recurring annual tax revenue, unquantified; fully closed-loop cooling using no municipal or ground water for compute, with local draw limited to sinks and restrooms, about the annual use of 2 homes. Giga will develop, own and operate the campus for the customer. Company figures: factories in Long Beach and Houston, more than 7 gigawatts of electrical infrastructure delivered, and more than 258.5 megawatts of critical IT capacity completed or under development. Brent Whitehead, president and co-founder, is quoted: \"This is exactly the kind of AI infrastructure Texas needs,\" and that AI infrastructure should \"leave a community stronger than it found it.\" The Clay release references Texas governor-elect Gina Hinojosa without quoting her, listing her priorities as data centres paying for their own power, water-efficient cooling, and not passing infrastructure cost to residents. An independent project tracker lists one Giga site in Royse City, BT Gateway, 60 megawatts, pre-construction, filed with the state in June 2026 and announced July 21, with the tenant recorded as not assigned as of November 6. Not established: the tenant, the rent schedule, the power provider, the total project cost, whether Marl and Clay are 2 campuses or 1, and whether either is BT Gateway.","corrections":[],"evidence":{"status":"verified","note":null,"sources":[{"role":"primary","label":"Giga Energy newsroom, Project Clay lease, Nov 17, 2026, the only entry for that date","url":"https://gigaenergy.com/news"},{"role":"primary","label":"GlobeNewswire: Project Clay, 10-year $1B lease, 60MW, Nov 17, 2026, 11:35 Eastern Time","url":"https://www.globenewswire.com/news-release/2026/11/17/3405044/0/en/giga-energy-inks-10-year-1b-lease-on-project-clay-a-60mw-ai-data-center-in-hunt-county-tx.html"},{"role":"primary","label":"GlobeNewswire: Project Marl, same terms, Nov 17, 2026, 09:00 Eastern Time","url":"https://www.globenewswire.com/news-release/2026/11/17/3404647/0/en/giga-energy-inks-10-year-1b-lease-on-project-marl-a-60mw-ai-data-center-in-hunt-county-tx.html"},{"role":"corrob","label":"Reuters via Yahoo Finance, Nov 17, 2026: Clay only, tenant unnamed","url":"https://finance.yahoo.com/technology/ai/articles/giga-energy-signs-1-billion-140705036.html"},{"role":"corrob","label":"Project tracker: Giga BT Gateway, Royse City, 60MW, no tenant assigned as of Nov 6","url":"https://datacenters.cutrerlabs.com/projects/giga-bt-gateway-royse-city/"}]},"strength":{"cost":"Low","commitment":"Medium","reversibility":"Moderate","persistence":"Year","rationale":"Cost is low. A press release costs nothing and the construction was already underway from July, so no new money is visibly at risk today. Commitment is medium: a signed 10-year lease is a real instrument, and Reuters confirmed it independently, but no filing, no counterparty and no rent schedule is public, and an unnamed tenant cannot be held to anything a reader can check. Reversibility is moderate because leases on unbuilt capacity collapse regularly when the tenant's own funding moves. Persistence is a year, the span to spring 2027 service, after which this is either an operating campus or a vacant shell."},"shift":{"prior":"An AI data centre lease names its tenant, or it is not real.","action":"Giga Energy issued 2 releases through GlobeNewswire on November 17, 2026. The first, dateline Houston at 09:00 Eastern Time, is headed \"Giga Energy Inks 10-Year, $1B Lease on Project Marl, a 60MW AI Data Center in Hunt County, TX\". The second, dateline Royse City at 11:35 Eastern Time, is identical in shape and headed \"Project Clay\". Only Project Clay appears on Giga's own newsroom at gigaenergy.com, where it is the most recent item, above a September 30 post. Reuters carried Clay alone, at 06:07 Pacific Time. Terms, common to both releases: a 10-year lease worth about $1 billion; a 60 megawatt GigaBase campus of about 30 acres in Hunt County, Texas; groundbreaking in July; build time under 8 months, described as less than half a traditional build; in service spring 2027; about 300 construction jobs and 24 permanent positions at an estimated $116,000 to $180,000; \"millions\" of recurring annual tax revenue, unquantified; fully closed-loop cooling using no municipal or ground water for compute, with local draw limited to sinks and restrooms, about the annual use of 2 homes. Giga will develop, own and operate the campus for the customer. Company figures: factories in Long Beach and Houston, more than 7 gigawatts of electrical infrastructure delivered, and more than 258.5 megawatts of critical IT capacity completed or under development. Brent Whitehead, president and co-founder, is quoted: \"This is exactly the kind of AI infrastructure Texas needs,\" and that AI infrastructure should \"leave a community stronger than it found it.\" The Clay release references Texas governor-elect Gina Hinojosa without quoting her, listing her priorities as data centres paying for their own power, water-efficient cooling, and not passing infrastructure cost to residents. An independent project tracker lists one Giga site in Royse City, BT Gateway, 60 megawatts, pre-construction, filed with the state in June 2026 and announced July 21, with the tenant recorded as not assigned as of November 6. Not established: the tenant, the rent schedule, the power provider, the total project cost, whether Marl and Clay are 2 campuses or 1, and whether either is BT Gateway.","update":"A billion dollars moves on 60 megawatts with the tenant withheld."},"inference":{"established":["A 10-year lease worth about $1 billion on a 60 megawatt Hunt County campus.","Giga develops, owns and operates it; service is expected in spring 2027.","Giga's own newsroom lists Project Clay and does not list Project Marl."],"unknown":["Who the tenant is. Giga names only a United States AI cloud provider.","That Marl and Clay are 2 campuses, or 2 leases. Giga has not said.","The rent schedule, the power source, or the total project cost."]},"narrative":{"hook":"A Texas data centre with no named tenant signed a $1 billion 10-year lease.","plain":"Giga Energy announced Project Clay on November 17: 60 megawatts in Hunt County, in service spring 2027. The customer is described only as a United States AI cloud provider.","story":["Under 8 months from groundbreaking to service is the fast lane of this buildout, and Giga will own and operate the campus for a customer it will not name. A near-identical $1 billion release went out 2 hours earlier under a different project name."],"trail":[{"d":"JUL 21","t":"A project tracker records Giga announcing a 60 megawatt Royse City site, BT Gateway, filed with Texas in June, with no tenant assigned."},{"d":"OCT 28","t":"American Electric Power says it signed 15 gigawatts of new power load in 3 months. Edition 065."},{"d":"NOV 11","t":"Amazon sells 75% of 13 new data centres to Blackstone at $5.0 billion gross value and leases all of it back. Edition 097."},{"d":"NOV 13","t":"Cerebras' landlord Digi Power X puts a price on the power: $40 million a year for 15 megawatts. Edition 091."},{"d":"NOV 17","t":"Giga announces Project Marl at 09:00 Eastern Time and Project Clay at 11:35, each a 60 megawatt Hunt County campus on a 10-year lease worth about $1 billion."},{"d":"Reacts","r":true,"t":"The unnamed tenant, who is now a public counterparty without a name; Hunt County and Royse City, taking the tax revenue and the load; Texas governor-elect Gina Hinojosa, whose data centre terms the release pre-answers; the electric cooperative carrying the power; and the North Carolina commission, which this week published what such a tenant must sign there."}],"glossary":[{"term":"Closed-loop cooling","def":"A sealed cooling circuit that recirculates the same water instead of evaporating it. It cuts local water draw sharply, at the cost of more electricity."},{"term":"Powered shell","def":"A finished building with power and cooling but no computers, leased to a tenant who installs its own. The landlord carries the construction, the tenant the chips."},{"term":"AI cloud provider","def":"A company that rents graphics processors by the hour rather than selling software. Most are young, venture-funded, and dependent on a few large customers."}]},"judgment":{"prompt":"Which explanation do you believe?","interpretations":[{"id":"a","label":"Anonymous tenants are now normal","text":"A billion dollars of rent with no counterparty named, and a wire ran it.","abstain":false},{"id":"b","label":"One lease announced twice","text":"Marl and Clay share every term, and only Clay survived on Giga's newsroom.","abstain":false},{"id":"c","label":"Speed is the product","text":"An 8-month build on existing power is what the premium buys.","abstain":false},{"id":"d","label":"Routine developer announcement","text":"Small landlords publicise leases to raise money. The terms are ordinary.","abstain":false},{"id":"e","label":"Too early to call.","text":"The evidence cannot yet separate these.","abstain":true}],"distribution":{"status":"held back until you have made your call","calls":null}},"story_thread":null,"what_to_watch":[{"linked_interpretation":"b","direction":"strengthens","observable_event":"Giga, GlobeNewswire or the tenant confirms Marl and Clay are the same campus, or the Marl release is withdrawn or corrected, by March 31, 2027.","window_end":"2027-03-31","state":"unresolved"},{"linked_interpretation":"b","direction":"weakens","observable_event":"Giga announces or a county record shows 2 distinct 60 megawatt campuses in Hunt County under lease, or Giga reports more than 120 megawatts leased there, by June 30, 2027.","window_end":"2027-06-30","state":"unresolved"},{"linked_interpretation":"c","direction":"weakens","observable_event":"Project Clay is not in service by August 31, 2027, or Giga discloses that the lease was terminated or renegotiated, by August 31, 2027.","window_end":"2027-08-31","state":"unresolved"}]}